Air Conditioning - Split Systems (42)
House and Land Package
House and Land Package Land $395,000, Package $$787,950 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
House and Land Package Land $355,000, Package $747,950. Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
House and Land Package Land $338,000, Package $687,500 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
House and Land Package Land $274,800, Package $561,468 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
House and Land Package Land $345,950, Package $699,950 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
House and Land Package Land $313,050, Package $639,800 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
House and Land Package Land $345,950, Package $699,950 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
Lot 132, Vanguard Avenue, Harli Estate, Cranbourne West
$771,950 / Fixed PriceHouse and Land Package Land $387,000, Package $771,950 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
Lot 110, Aurora Drive, Harli Estate, Cranbourne West
$748,950 / Fixed PriceHouse and Land Package Land $369,000, Package $748,950 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
Lot 1605, Watercolour Boulevard, Orana Estate, Clyde North
$751,950 / Fixed PriceHouse and Land Package Land $345,950, Package $699,950 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
Lot 1606, Watercolour Boulevard, Orana Estate, Clyde North
$751,950 / Fixed PriceHouse and Land Package Land $380,000, Package $751,950 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
Lot 914, Clyde Springs Estate, Clyde North
$690,390 / Fixed PriceHouse and Land Package Land $369,000, Package $690,390 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
Lot 915, Clyde Springs Estate, Clyde North
$680,950 / Fixed PriceHouse and Land Package Land $370,000, Package $680,950 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
Lot 916, Clyde Springs Estate, Clyde North
$659,760 / Fixed PriceHouse and Land Package Land $371,000, Package $659,760 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]