Donnybrae (4)
House and Land Package Land $345,950, Package $699,950 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
House and Land Package Land $313,050, Package $639,800 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]
House and Land Package Land $345,950, Package $699,950 Turnkey Inclusions Site Works Concrete – waffle pod slab, engineer designed “M” up to “P” class, maximum 300mm site fall over the building platform, no existing fill. Slab costs will be adjusted if founding conditions differ. Compaction report “site specific” is required or else other cost incurred. […]